Klant | Consorcio Santa Marta |
---|---|
Locatie | Talagante, Región Metropolitana, Chile |
Periode | 2013-2014 |
Capaciteit | 20MW |
Design documentation por piping and I&C interconnection between the Solar Steam Generation System (SSGS) and the Coal Fired Power Plant CTM-1 in Mejillones, Chile.