E-kerosene production from green H2 and biogenic CO2 from Salamandre 2nd generation biogazification plant (60kta) and the Normandy industrial basin (210kta)
Klant | Confidential |
---|---|
Locatie | France |
Periode | 2022 – ongoing |
Capaciteit | 255 MW |
Pre-Feasibility Study
Owner Engineer for the Feasibility Study