This project encompasses a ±500 kV direct current power transmission line (> 1,000 km), the construction of two substations, two ground electrode stations and connection of the 400 kV AC substations to the national power grids.
Production and storage of 50tons of H2 to supply future H2 turbines test bench.
Feasibility Study