The Power of the River: More Electricity for Mozambique

01 Mar 2021

Electricity for hundreds of thousands of households: An additional hydropower plant on the Revué River will help meet Mozambique's energy requirements, with our experts conducting the feasibility study.

Mozambique is experiencing an economic boom.
The south-east African country’s economic mainstay is based on raw material extraction and agriculture. To meet the growing energy requirement, the construction of an additional hydropower plant, Mavuzi II, is planned on the Revué River, with Tractebel conducting the feasibility study.

As many of Mozambique’s rivers flow from the highlands to the plains, hydropower plants – especially those in the Central Region – form the backbone of the country’s energy supply. The planned Mavuzi II hydropower plant will add a further 37 MW to the output of the existing Chicamba (44 MW) and Mavuzi I (50 MW) hydropower plants.

Technical expertise and many years of experience

In August 2020, Electricidade de Mozambique (EdM) commissioned Tractebel and the Portuguese engineering company TPF-Consultores to conduct a feasibility study for the new construction. Tractebel, with its proven expertise, has already conducted numerous studies for comparable hydropower projects.

The state-owned energy company EdM has been focussing on the project since 2013. Funded by Swedfund, a Swedish development finance institution, the study is to be completed within eighteen months of its commencement.

Environmental assessment and economic feasibility analysis

The site intended for Mavuzi II is located in Central Mozambique, downstream from the existing hydropower plant Mavuzi I. The river in this section is already regulated, i.e. no longer in its natural state. Tractebel’s hydropower experts are investigating the structural and operational measures which could optimise the expected energy output of the future hydropower plant on the Revué River. The main option here is to impound the water through a dam some 220m long and up to 60m high, and with up to 3km-long waterways leading the water to the turbines. With an installed capacity of 37 MW, the turbines will be able to generate an estimated 100 GWh annually. This amount would suffice to supply hundreds of thousands of households in the country with electricity.

The study also encompasses an environmental and social impact assessment, as well as financial and economic analyses required by international finance institutions. 

One power plant, unlimited benefits

The significant increase in electricity generated by the Mavuzi II power plant will positively impact the daily lives of the people of Mozambique, while opening doors to new opportunities to generate income.

Tractebel is investigating how to optimise energy production at the Revué River. Image: Tractebel

Gerelateerd nieuws

Tanahu_Ceremony_at_tunnel_2

Tunnel breakthrough a key milestone in 140-MW hydropower project in Nepal

Nestled among the towering Himalayas west of Kathmandu, the Tanahu hydropower project reached a major milestone on March 31, 2024: the breakthrough of the 1.4-km...

Lees verder
19 Apr 2024
Cover_1

Listen to Engineering Angles, Tractebel’s podcast!

We caught up with Stéphanie Brine, Group Manager at Tihange nuclear power station in Belgium, to discuss her fascinating career path, her experience as a woman in...

Lees verder
02 Apr 2024
PANT01_project_image_240318

Designing a medical radioisotope production facility for cancer treatment

Jointly with its partner, MODULO architects, Tractebel will combine its infrastructure and nuclear expertise to support the design and construction of PanTera's actinium-225...

Lees verder
28 Mar 2024
AdobeStock_383755906

Powering data centres with advanced nuclear technologies

Tractebel and its subsidiary company RED published a White Paper on how Small Modular Reactors (SMRs) can provide zero-emission, reliable, and sustainable energy to data...

Lees verder
06 Mar 2024