Ethiopia-Kenya Power System Interconnection Project (2 GW)

Ethiopia and Kenya
Gekoppelde oplossingen
Energy
  • ±500 kV direct current power transmission line of 1,068 km
  • Construction of two substations for the conversion of 400 kV AC to 500 kV DC
  • 2 ground electrode stations
Klant Kenya Electricity Transmission Company, Ethiopian Electric Power Corporation
Locatie Sodo, Äthiopien
Periode 2013 - 2020