Situated on an exceptional site, the Princess Grace Hospital Centre meets all of today's architectural requirements to ensure the excellence of tomorrow's medicine. The topographic context and the urban density of the site make this an extremely challenging project.
Sylwin Alpha was at the time of installation the largest and heaviest HVDC substation in the world. Innovative and patented engineering ensured a smooth installation.
Design of: