The task of this project was the assessment of existing and compilation of missing documentation of the wind farm regarding foundations, cable laying, the offshore transformer platform, technical and health and safety standard
Sylwin Alpha was at the time of installation the largest and heaviest HVDC substation in the world. Innovative and patented engineering ensured a smooth installation.
Design of: