This project encompassed a 500 kV transmission line, 3 x 500 kV transmission lines to interconnect Jirau HPP with Porto Velho‘s substation and the connection to the national power grid.
Integrated Pump Storage Project for peak load management independently powered by Wind Solar Hybrid.
Owner’s Engineer