Conversion of the #20 GE 7EA Gas Turbines from Oil firing to Natural Gas with back-up fuel as Distillate Oil including the Fuel Gas Supply system
Klant | Saudi Electricity Company (SEC |
---|---|
Locatie | Riyadh Saudi-Arabien |
Periode | 2023 – ongoing |
Capaciteit | 20 x 60 MW (approx. 1200MW) |
Owner’s Engineer