This project encompassed a 500 kV transmission line, 3 x 500 kV transmission lines to interconnect Jirau HPP with Porto Velho‘s substation and the connection to the national power grid.
Green field plant for powder paints production
Feasibility study
Basic design
Next phase – EPCM