This project encompasses a ±500 kV direct current power transmission line (> 1,000 km), the construction of two substations, two ground electrode stations and connection of the 400 kV AC substations to the national power grids.
Pre-feasibility Study of a Storage System (H2/battery) for a Wind Farm
Conceptual Design
CAPEX Estimation