Goldisthal Pumped Storage Plant

Germany
Gekoppelde oplossingen
Infrastructuur
Water

The pumped storage plant Goldisthal is located on the upper course of the river Schwarza in Southern Thuringia. The effective storage capacity of the upper reservoir is 12 x 106 m³ and is provided with a bell-mouth type intake structure. It is connected by two steel lined 820 m long pressure tunnels, of 6.2 m dia., to a cavern powerhouse, which contains four 265 MW pump-turbines. Two 275 m long tailrace tunnels, of 8.2 m dia., run to the outlet structure at the lower reservoir on the Schwarza River.

Klant Vattenfall Europe Generation AG
Locatie Goldisthal, Duitsland
Periode 1991 - 2004
Capaciteit 1,060 MW

Services Provided

with the trusted expertise of Lahmeyer International

Gerelateerde expertise

De gerelateerde expertisedomeinen zijn:
Siting & Geotechnical Engineering Hydro & Electromechanical Equipment Geotechnics and Underground Works Water Transfers and Pumping Stations Large Hydropower Projects Pumped Storage Plants Dams