This project encompasses a ±500 kV direct current power transmission line (> 1,000 km), the construction of two substations, two ground electrode stations and connection of the 400 kV AC substations to the national power grids.
Klant | KETRACO and EEPCO |
---|---|
Locatie | Ethiopia - Kenya |
Periode | 2013-2017 |
Capaciteit | ±500 kV direct current power transmission line (> 1,000 km) |