After an exhaustive Energy Audit, the former offices from ENGIE Laborelec were completely renovated, not only with new façades but also the energy consumption of the building was redesigned and the renewable energy production was incorporated on site.
Klant | ENGIE Lab |
---|---|
Locatie | Linkebeek, Belgium |
Periode | 2009 |