This project encompassed a 500 kV transmission line, 3 x 500 kV transmission lines to interconnect Jirau HPP with Porto Velho‘s substation and the connection to the national power grid.
Hot water pipeline between NPP Temelín and České Budějovice city – 2 pipelines DN 500, 26 km
Detail design of heat exchanger station in NPP Temelin and 9km of pipeline