This project encompasses a ±500 kV direct current power transmission line (> 1,000 km), the construction of two substations, two ground electrode stations and connection of the 400 kV AC substations to the national power grids.
Hot water pipeline between NPP Temelín and České Budějovice city – 2 pipelines DN 500, 26 km
Detail design of heat exchanger station in NPP Temelin and 9km of pipeline