The project covered the initial preparatory phase of the dismantling of the first nuclear power plants of ENGIE Electrabel. In 2012, the preparations began for the implementation of the decommissioning of the eldest units.
Klant | ENGIE Electrabel |
---|---|
Locatie | Doel, Beveren, Belgium |
Periode | 2012 - 2015 |
Basic Design
Owner’s Engineer mission encompassing: