TRACTEBEL was awarded by Prime Meridian Powergen Corporation a contract of Owner Engineering services for the implementation of the 100 MW OCGT power plant in Batangas, Philippines.
Klant | PMPC (First Gen Corp.) |
---|---|
Locatie | Batangas, Calabarzon, Philippines |
Periode | June 2014 – October 2016 |