This project encompassed a 500 kV transmission line, 3 x 500 kV transmission lines to interconnect Jirau HPP with Porto Velho‘s substation and the connection to the national power grid.
Owner’s Engineer and detailed engineering for 140 MW Solar PV Power Project in Rajasthan, India for Soliare Direct, India