Client | Espinos S.A. |
---|---|
Emplacement | Los Vilos, Coquimbo, Chile |
Période | 2022 |
Capacité | 115 MW (72 Units of 1.6 MW each) |
Performance tests for the Olivos power plant, a backup generation plant consisting of seventy-two diesel generators.
Performance test required by the Chilean independent grid operator, Coordinador Eléctrico Nacional. Testing methodology according to ISO 3046 and ISO 15500.