Performance Test for Los Guindos Generation Plant

Chile - Cabrero
Solutions associées
Client Central Los Guindos
Emplacement Cabrero, Región del Bío Bío, Chile
Période 2018, 2020 and 2021
Capacité 278 MW

Project Description

Performance tests for Los Guindos power plant, a backup generation plant consisting of two gas turbines fueled by diesel. First online guided performance test for Coordinador Eléctrico Nacional.

Services Provided

Performance test required by the Chilean independent grid operator, Coordinador Eléctrico Nacional. Testing methodology according to ASME PTC 22 and ISO 2314.

Sous-domaines utilisés

Introduction aux sous-domaines utilisés
Energy Efficiency Consulting

Références liées