Client | Consorcio Santa Marta |
---|---|
Location | Talagante, Región Metropolitana, Chile |
Period | 2021 |
Capacity | 20MW |
Performance Test for Santa Marta power plant. Santa Marta is a Renewable Energy plant conformed by 10 generator sets (10 Caterpillar biogas motors of 2 MW each) that burns waste gas produced in the adjacent landfill.
Realization of performance test required by the Chilean independent grid operator, Coordinador Eléctrico Nacional. Testing methodology according to ISO 3046 and ISO 15500.