Performance Test for Pajonales Power Plant

Chile - Vallenar
Linked solutions
Client Prime Energía
Location Vallenar, Región de Atacama, Chile
Period 2021
Capacity 112MW

Project Description:

Performance Test for Pajonales power plant. Pajonales is a backup plant conformed by 42 diesel MTU generator sets (56 MTU diesel motors of 1,8 MW each).

Services Provided

Realization of performance test required by the Chilean independent grid operator, Coordinador Eléctrico Nacional. Testing methodology according to ISO 3046 and ISO 15500.

Linked subdomains

The linked subdomains are:
Energy Efficiency Consulting

Related references