This project encompassed a 500 kV transmission line, 3 x 500 kV transmission lines to interconnect Jirau HPP with Porto Velho‘s substation and the connection to the national power grid.
Production and storage of 50tons of H2 to supply future H2 turbines test bench.
Feasibility Study