Hydroelectric project in India sets two world records
The 960 MW Polavaram hydroelectric project provides hydropower, irrigation, and drinking water to five regions across India’s...
Trouver plusTractebel climbs to #3 and #4 respectively in the 2017 ENR Global Ranking of the world’s top international design firms for wind and solar projects, and cements its #2 position for hydro projects.
Every year, Engineering News-Record (ENR) magazine publishes rankings of the largest construction and engineering firms worldwide, measured by gross revenues generated from projects outside each firm’s respective home country. In 2017, Tractebel climbed to 3rd and 4th positions respectively among the world’s top design firms for wind and solar projects and kept its position as the 2nd largest in Hydro. These figures emphasise Tractebel’s strong position in renewable energy projects and underpin the company’s vision to be at the helm of the energy transition.
Tractebel also climbed from #8 to #5 in Nuclear, but dropped to #5 in T&D. Click here to find out more.
The 960 MW Polavaram hydroelectric project provides hydropower, irrigation, and drinking water to five regions across India’s...
Trouver plusNestled among the towering Himalayas west of Kathmandu, the Tanahu hydropower project reached a major milestone on March 31, 2024: the breakthrough of the 1.4-km...
Trouver plusWe caught up with Stéphanie Brine, Group Manager at Tihange nuclear power station in Belgium, to discuss her fascinating career path, her experience as a woman in...
Trouver plusAvec son partenaire MODULO architects, Tractebel combinera son expertise en matière d'infrastructure et de nucléaire pour soutenir la conception et la construction de...
Trouver plus