This project encompassed a 500 kV transmission line, 3 x 500 kV transmission lines to interconnect Jirau HPP with Porto Velho‘s substation and the connection to the national power grid.
Tractebel develops conceptual engineering for molten salts thermal storage plants. The project aims to be connect to existing power plants.