This project encompassed a 500 kV transmission line, 3 x 500 kV transmission lines to interconnect Jirau HPP with Porto Velho‘s substation and the connection to the national power grid.
Power plant to provide back-up, on-demand capacity for the region in case of high demand.
Owner’s Engineer
Configuration