This project encompassed a 500 kV transmission line, 3 x 500 kV transmission lines to interconnect Jirau HPP with Porto Velho‘s substation and the connection to the national power grid.
New LNG Truck Loading Bay
FEED
Owner’s Engineer for Execution Phase