Industrial complex for extraction and production of potassium chloride
Partager ceci sur
Emplacement
Sergipe, Brasil
Période
2010-2013
Basic design of the cogeneration plant (69 MW and 330 tvapor/h)
Evaluation of raw water supply alternatives, waste disposal routes, city-gate and pipeline location, site selection and connection to the basic network
Support in technical, commercial and contractual evaluations for the selection of EPC proposals of the main packages (SEs, Cogeneration, Water Treatment, and BOP)
Sous-domaines utilisés
Introduction aux sous-domaines utilisés
Waste managementCogeneration (Heat & Power)Water Distribution Networks