The Egyptian energy and manufacturing company ElSewedy Electric appointed Tractebel Engineering GmbH as independent technical advisor for the investigation of the purchase of a diversified Renewable Energy Sources portfolio in various regions of Greece.
The 64 MW portfolio owned by RF Energy S.A. consisted of three operating Wind Farms (WFs) and two operating Small Hydro Power Plants (SHPPs).
The wind farms were: i) the 10 MW Kilindria WF in Kilkis regional unit island; ii) the 15 MW Tsouka WF in Arcadia regional unit; iii) the 35.4 MW Aderes wind complex in Argolida regional unit; iv) the 2.6 MW Kerinitis SHPP in Achaia regional unit and; v) the 1.015 MW Agios Andreas SHPP in in Achaia regional unit.
Client | ElSewedy Electric Company |
---|---|
Emplacement | Various regions, Greece |
Période | 2019 |
Capacité | 64 MW |