Designing a future-proof stadium in Sardinia

04 mars 2018

The groundbreaking design proposal of Tractebel and GAU Arena for the new home of Italian football club Cagliari Calcio was unveiled on February 28th. Tractebel and GAU Arena are one of the three shortlisted finalists out of 25 bidders.

On February 28th, the 3 shortlisted finalists out of 25 bidders were called in to present their design proposal of Cagliari Calcio’s new stadium to institutions, media and fans.

All three finalists’ proposals are now showcased until 9th March in a special exhibition at Sardinia Arena. Open to the public, the exhibition invites fans and the local community to give their feedback on the proposed concepts.

Designed to reflect harmony with the surrounding nature, the stadium aims to be a lighthouse for the city. Not only a home for football, but a multi-purpose complex to enjoy every day of the week, attracting and hosting not only fans, but all types of visitors beyond match days.

The stadium is designed to receive over 24,000 spectators, which could eventually grow to 30,000. Every single aspect of the complex and the surroundings has been thought to make the "stadium experience" unique and integrate the stadium into the urban area and city life. The respect of natural resources is guaranteed by the implementation of state-of-the-art technologies in terms of energy production and storage, water saving, and reuse of any waste material. The use of natural ventilation and the choice of technology with low energy consumption will contribute to a sustainable use of resources in order to get a Near-Zero Emission building and obtain a Leed certification.

The design has been made with the use of Building information modelling (BIM) tools. The winning proposal should be selected by April and construction is expected to end by June, 2021.

Discover the teaser of Tractebel's design proposal for the Cagliari Calcio stadium presented to the Institutions, Media and Fans

 

Actualités liées

AdobeStock_286969556_2

Listen to Engineering Angles, Tractebel's podcast!

In the latest episode of Engineering Angles, we caught up with Neha Bansal, Deputy General Manager of Hydropower & Water Resources in Business Development &...

Trouver plus
03 juin 2025
BESS_Kallo_Belgium

Soutenir les ambitions d'ENGIE en matière de stockage de batteries en Belgique

Tractebel asssite ENGIE pour construire son deuxième parc de batteries à grande échelle en Belgique, contribuant ainsi à la mise en place d'un système énergétique flexible,...

Trouver plus
27 mai 2025
20241127_UNOC

Building the venue for the 2025 UN Ocean Conference

Our Urban teams from France and Monaco are leading the design and construction supervision of the Mediterranean Pavilion, ahead of the third United Nations Ocean...

Trouver plus
27 mai 2025
Group_2

Tractebel supports first metro project in the Western Balkans and the largest infrastructure project in Serbia

Our transport infrastructure experts signed a mandate on April 25, 2025, to provide technical services on the first metro project in the Western Balkans. This is our...

Trouver plus
30 avril 2025