This project encompasses a ±500 kV direct current power transmission line (> 1,000 km), the construction of two substations, two ground electrode stations and connection of the 400 kV AC substations to the national power grids.
CCGT upgrade : turbine and generator, condenser, feedwater pumps, DeNOx and CO catalysts
OE mission