Basic design of the coal handling system from the delivery port (Barcarena) to the boiler storage silos
Share this on
Client
ALUNORTE
Location
Pará, Brasil
Period
2002-2004
Basic design of cogeneration plant (60 MW) for power supply and process steam for the expansion of the Bauxite processing plant
Preparation of CAPEX (EPC basis) for Coal Cogeneration and Handling
Several studies to define the fuel supply matrix for cogeneration, as well as environmental studies to evaluate the destination of Alumina, Bauxite and Coal waste