UAE government funded program to install and operate hybrid wind and solar plant
Client | Masdar |
---|---|
Location | Sir Bani Yas - Abu Dhabi - United Arab Emirates |
Period | 2021 – ongoing |
Capacity | 103.5MW; 23 Goldwind 155 Turbines; 14MWp single-axis tracking solar PV plant |
Owner’s Engineer