The wastewater treatment plant La Atarjea, to be located to the east of the existing drinking water treatment plant in the city of Lima, will receive the wastewater from Carapongo, Santa Maria of Huachipa, Ate-Santa Anita and Cajamarquilla, all of them town districts of Lima. The treatment capacity will be designed for 870.000 inhabitants (design horizon 2028) and 1.2 million inhabitants at the final stage. The facilities shall cover full mechanical and biological treatment including sludge treatment and energy recovery (biogas and moto-generators) for 30% of total energy consumption. The plant includes screens, grit chamber, primary sedimentation tank, aeration tank, final clarifiers, disk filters, UV disinfection, sludge thickeners, sludge dewatering, and digestors. Odour treatment is done using photoionization. The project is initially defined to be carried out within 4-years-time.
Client | SEDAPAL, Peru |
---|---|
Location | Av. las Praderas, Cercado de Lima 15009, Pérou |
Period | 2017 - 2021 |
Capacity | Final stage (2038): 1,500,000 inhabitants & max inflow: 2,1 m³/s |
With the trusted expertise of GKW Consult