Teles Pires Transmission Line

Brazil
Linked solutions
Energy
Client State Grid (Teles Pires Transmissora)
Location Paranaíta - State of Mato Grosso, Brazil
Period 2012-ongoing
Capacity 500 kV direct current power transmission line (> 1,000 km)

Services provided

Linked subdomains

The linked subdomains are:
High-Voltage Transmission (HVAC/HVDC/FACTS)