Vermio complex, with an aggregated installed capacity of 46.2 MW is sponsored by Terna Energy S.A., a subsidiary of GEK Terna Group. The complex consists of two neighbouring wind farms: the 37.8MW Eressou Ypsoma – Fourka wind farm (capped at 36MW due to licensing restrictions) and the 8.4MW Lefkes – Kerasia wind farm. Both wind farms were connected to the new constructed substation ”Georgianoi”.
Client | Euopean Investment Bank |
---|---|
Location | Vermio, Greece |
Period | 2017-2020 |
Capacity | 46.2 MW |
With the trusted expertise of Lahmeyer International