Solar Plant with capacity of 350 MW and built in an area of 431.5 Hectares.
Client | Solaire Direct/ Engie Solar |
---|---|
Location | Aguascalientes, Aguascalientes, México |
Period | 2018-2019 |
Capacity | 160 MW |
The park is under construction and is expected to be completed in 2019, occupying a total area of 431.5 Hectares.