This project encompassed a 500 kV transmission line, 3 x 500 kV transmission lines to interconnect Jirau HPP with Porto Velho‘s substation and the connection to the national power grid.
Pre-feasibility Study of a Storage System (H2/battery) for a Wind Farm
Conceptual Design
CAPEX Estimation