This project encompassed a 500 kV transmission line, 3 x 500 kV transmission lines to interconnect Jirau HPP with Porto Velho‘s substation and the connection to the national power grid.
Design and implementation of a National Electrification Strategy and Action Plan to ensure access to energy, from 15% to 70% by 2035, at good quality and low cost.