This project encompassed a 500 kV transmission line, 3 x 500 kV transmission lines to interconnect Jirau HPP with Porto Velho‘s substation and the connection to the national power grid.
Integrated captive H2 offtake
Pre-Feasibility and Feasibility Study
Owner’s Engineer for Pilot Project