This project encompassed a 500 kV transmission line, 3 x 500 kV transmission lines to interconnect Jirau HPP with Porto Velho‘s substation and the connection to the national power grid.
Developing beyond state-of-the-art software tools on energy transition topics to deliver high added value studies, like PACA 100 project