This project encompassed a 500 kV transmission line, 3 x 500 kV transmission lines to interconnect Jirau HPP with Porto Velho‘s substation and the connection to the national power grid.
India’s first LNG terminal by global energy companies (Shell Gas and Total Gaz).
Capacity
3 to 5 MTPA expansion: